Building for Road, Rail and Air

Road & Rail

State-of-the-art transport accommodation, sympathetic to your existing operations and security issues - delivered in up to half the time of traditional construction


The speed of off-site construction helped us to minimise the level of disruption to the operational railway. It allowed us to guarantee quality and for this project, we felt it was by far the most efficient and cost-effective building method.

Mark Jordan,
Assistant Project Manager, London Underground

When it comes to providing high quality accommodation facilities, the challenges facing the transport sector are varied. That's why you need a fast, flexible solution offering state-of-the-art build quality, and a quick, discreet method of delivery. You also need a solution that considers your existing operations as well as site access and security issues.

With earlier occupation, guaranteed quality, design flexibility, improved site safety and less disruption to your site during construction, the Yorkon building system offers you the ideal solution for a range of transport uses. These include:

  • Ticket halls
  • Cafes
  • Lounges
  • Waiting areas
  • VIP lounges
  • Staff and crew accommodation

How will you benefit from a Yorkon solution?

  • Minimum disruption and a cleaner safer, more secure site - Site security and safety are paramount. Compared to HSE statistics on the safety of traditional construction methods, Yorkon solutions increase site safety by 46%. Our buildings are constructed in a controlled factory environment, so you can expect 90% fewer vehicle movements and a shorter programme - giving you a safer, cleaner site and minimal disruption.
  • Security vetted staff - For optimum security on your site.
  • Speed - Innovative building projects delivered in up to half the time of traditional construction. Which means earlier occupation for clients, staff and travellers.
  • A pioneering 5-year product and 20-year structural warranty package - giving you the assurance that your building is built to last.
  • With independent British Board of Agrement and Local Authority Building Control LANTAC approval, you can be certain that your facilities will meet the relevant Building Regulations and Building Standards.
  • LPBC approval and fire engineered design minimises the risk from fire.
  • Your building delivered on time and on budget -that's a promise.

Read what our clients have to say

To find out more about how the benefits of a Yorkon solution translate in real terms, read our Road & Rail Case Studies.

Find out moreTo find out how a Yorkon solution could provide you with a real alternative to traditionally built facilities

Call now to discuss your Road or Rail project on
0845 2000 123 or contact us today!



Visit the Factory in York

Visit our Factory Call:
0845 2000 123 or Click Here

Yorkon - Delivering your project on time and on budget

On Time, On Budget, Our Promise...

Unrivalled warranty protection

5 & 20 Year Product Warranties NOW available

Homepage
© Yorkon 2009
Registered Office, Huntington House, Jockey Lane, Huntington, York YO32 9XW. Registration number 2912200 England
BBA ApprovalLABC Approval14001 Accreditation